 Extended Aeration Sewage Treatment - the modern way to digest raw sewage. 

Septic Tanks

These are not extended aeration sewage systems, in fact, no air is introduced into the sewage at all.  The digestion is anaerobic and the resulting septic effluent is exactly that - SEPTIC.  See septic tank sewage systems
 
Septic tank effluent has a very high Biological Oxygen Demand (BOD) and strips oxygen out of anything it touches, be that in watercourses or the soil, leaving an environment which cannot sustain animal life.  Even worms breathe oxygen through their skins, so installing a septic tank soakaway system under your lawn ensures a sterile, dead garden with resulting drainage problems.
 
Septic tanks also produce Methane as a by product of the digestion by anerobic bacteria.  Methane gas, which is generally vented to the atmosphere form the tank, is a 21 times worse pollutant than carbon dioxide and are a significant contributor to greenhouse gas emissions.
 
Septic tanks must be emptied annually.
Modern Septic Tank diagram

 

Traditional aerated sewage treatment plants

These are 3 stage units.  They are not extended aeration sewage plants.  The first stage is a Primary Settlement Tank which works in the same way as a septic tank - it settles out all the large solids for regular removal by tanker and produces a septic, methane producing effluent which has to be oxygenised in the second stage or biozone.  These plants aerate the sewage for around 6 hours, during which time the aerobic bacteria digest the remaining solids in the effluent.

The emptying of the tank is the most expensive running cost of a sewage treatment system.

Primary Settlement Tanks are not odourless.

A correctly operating Primary Settlement Tank in a three stage sewage treatment plant
 
Primary Settlement Tanks are NOT odourless
 
 

Extended Aeration sewage treatment plants

These don't need a Primary Settlement Tank.  The raw sewage flows directly into the aerobic digestion chamber where all the solids are digested by the aerobic bacteria.  This is possible because the sewage is aerated for a minimum of 24 hours, giving vastly increased time for almost complete digestion of all the solids, not just those in suspension. 
 
No Methane is produced.
 
The benefits of the Crystal sewage treatment plant are enormous. 

An Extended Aeration Sewage Treatment Plant is odourless throughout the system.

Extended Aeration sewage plant air diffuser
 
Tank Installers Wanted
Crystal is currently seeking installers for  sewage plant and septic tanks which DO have the EN12566-3 throughout many parts of the UK.
Latest News
Consent to Discharge axed under the EPP2 regs. You now apply for a Discharge Permit or exemption for septic tank and sewage systems online free of charge.
OASIS Rainwater Harvesters

We also build our own OASIS Rainwater Harvesting Systems

Contact Us
 
The Byre
Foggathorpe
SELBY
YO8 6PX
Tel. 01757 288022
or 01757 289423
Email
Skype Me™!
British Water Members

Please telephone us on 01757 288022 as sewage treatment enquiries are too complex for email correspondence

Powered by Create